TFA Major Inspection Pelton turbine driven ABB generator

TFA major inspection ABB 17,700 kVA – 6900 V hydro generator with rotor removal and replacement of the field main insulation.

Category

Hydrogenerators, Major inspection, TFA, Turbine generator

Tags
Hydro generator, Major Inspection, TFA